Save Time |

Save Time
Veritas Accelerator Rooms can be built in as little as 2 weeks and Veritas Particle Therapy Facilities can be built in as little as 4 months.
Our VeriShield™ Radiation Shielding modules are cured in our plant, where they also undergo extensive QA checks and testing. They are installed on-site quickly, without any additional time for curing. Interlocking and dry-stacking, VeriShield not only provides superior attenuation, it is also load-bearing.
Our MEP and interior panel systems are pre-engineered off-site. We simulate field conditions, pre-assembling all of the pieces in our factory to expedite installation and minimize labor costs.