VeriShield Rooms vs. Concrete Vaults - Save Floor SpaceConcrete

Roll over buttons below to see a comparison to concrete

Concrete Doorless Entry
VeriShield Doorless Entry
VeriShield Direct Entry

 

Save Space VerticallySave Space

VeriShield or Concrete? The choice is clear.

VeriShield Concrete
Check
Uses less than half the floorspace of concrete Displaces otherwise usuable space
Check
Weeks of construction Months of construction
Check
Takes room off the critical path Critical path construction element
Check
Therapy rooms entirely contained on one floor Shielding extends into floor above
Check
Modular and removeable structure
Permanent inflexible structure
Check
Construction in any type of weather
Construction can be delayed by inclement weather
Check
Greatly reduced wall and ceiling thicknesses
Extremely thick walls and ceilings
Check
Quick, easy installation - no formwork
Complicated site preparation, formwork and excavation
Check
Superior neutron, photon and proton attenuation
Thicker barrier needed to provide same level of protection
Check
No curing time - Ready immediately upon placement
Up to 28-day cure times can delay other aspects of construction
Check
Minimal steel reinforcement
Thousands of tons of rebar and reinforcement
Check
Engineering/Physics services included
Services must be purchased separately
Check
Consistent block density - Q.C. checked
Density may fluctuate between batches
Check
Guaranteed 100% effective
Not guaranteed

 

VeriShield
Features

Comparison
to Concrete

VeriShield
VPAC
Specifications

Veritas
Home Page
About Us
Brochures & Media
Contact Us

Radiation Shielding
VeriShield Features
Comparison to Concrete
VeriShield Installations
Specifications

Radiotherapy Suites
VeriShield Rooms
Rapid Oncology Centers
Quantum Series

Proton Therapy

Shielded Doors
Swing
Sliding

Proton

Smart Door System

Veritas Interiors
Interiors
Interior Designs